ScafWest

Mount Henry Bridge Mobile Scaffold

CivilWest Australia

Mount Henry Bridge Mobile Scaffold

Scafwest were tasked with the design and construction a mobile scaffold for access to the soffit for painting of Mount Henry Bridge.

Challenges

  • Only a 225mm void along the bridge length to drop through
  • Required 3m cantilever
  • Limited to one side of the internal bridge due to cable trays and posts
  • Total length of 660m
  • Excessive counterweights made the mobile unit immovable
  • Inconsistencies along the bridge structure
  • Movement in the bridge between voids
  • Working over water
  • Moving the unit with a person on it
  • Access on and off the unit
  • Public access protection requirements
  • Engineering parameters pushed to capacity
  • Development of a rescue plan

Outcome

  • Delivered the project in a timely manner
  • Innovation saved the client from the cost of scaffolding the entire length
  • Achieved engineering precision
  •  
  • Incorporated aluminum components such as ampligrip grating
  • Fabricated components, including a wheel on a bearing to fit between the void
  • Developed a system to move the mobile unit in the internal void without removing counterweights
  • Client was amazed and extremely pleased with the result

The successful design and construction of the mobile scaffold for the Mount Henry Bridge project demonstrated Scafwest’s commitment to innovative problem-solving and engineering excellence.

Despite multiple complex challenges, the team delivered a solution that met stringent requirements while optimizing costs and efficiency for the client. The project not only highlighted Scafwest’s ability to engineer specialized solutions but also exceeded client expectations, reinforcing trust and satisfaction with a result that was both functional and cost-effective.

Not a member yet?

SAA Members, nominate your project to claim your FREE SAA T-Shirt & Cap!

Log into SAA

Subscribe

* indicates required